Zenith – World Class Engineering

18 Jun 2015

Zenith Consultants, with the on-site installation support of Zenith Structural Access Solutions Limited, has successfully completed a major reinforced concrete chimney refurbishment at a cement plant in the United Kingdom.

The on-site works included the installation of a temporary by-pass stack secured to the main chimney windshield thereby enabling the flue gases to be diverted. This has allowed Zenith to carry out necessary internal repairs.

Zenith Consultants designed all of the temporary works for the project including the innovative lifting technique for the installation of the temporary by-pass stack. “It was Zenith’s ability to handle all aspects of the contract that secured this project,” comments Colin McCurdy, Managing Director. “Our customers have peace of mind knowing that safety is our number one priority. Our design engineers work very closely with our experienced contracts management team to provide workable solutions that minimise shutdown periods thereby allowing the customer to continue production within the shortest possible time”.

Over recent years, Zenith’s unique ability has seen the company secure numerous major contracts worldwide that are at the cutting edge of technological advancement.

ARVE Error: Invalid URL /wp-content/uploads/2015/07/Zenith_Hope_Construction_Materials_HD11.mp4 in mp4

Installation of a bypass stack to facilitate internal repairs to the main chimney.
Hope Construction Materials, UK, 2015.

IMG_0132

Structural steel work support

Flue Entry Level

KODAK Digital Still Camera

Flue Entry Level

KODAK Digital Still Camera

View From Ground Level

KODAK Digital Still Camera

Preparing By-Pass Sections for Lifting

KODAK Digital Still Camera

Lateral Supports

KODAK Digital Still Camera

Top Level Support Structure

Share this