Tarmac Dunbar Phase one
12 Apr 2021
Time lapse showing the installation of external scaffold and the installation of rolling crash decks on the internal of the building. Installation of the equipment to allow the safe removal of asbestos sheeting and an extreme build out of cement debris whilst still allowing normal plant activities to continue.
This shows the level of engineering, innovation that Zenith brings to a project. Phase two shall commence with the full removal of the existing roof and cement build up and the installation of new roof covering.