Flarestacks

In what is a significant strategic partnership, we have been appointed as John Zink International’s nominated sub-contractor to carry out the replacement of their flare stack tips worldwide. As John Zink engineers the world’s most advanced flaring systems this represents a major coup for Zenith. Working in conjunction with John Zink, we have pioneered the design of a purpose-built davit to improve the process of replacing flare tips. The davit is positioned directly below the termination point of the flare stack thereby negating the use of expensive cranes. This has been designed to take the weight of the tip as it is lowered to the ground and lift the new replacement tip into position. This innovative solution to a complex and expensive problem is now being adopted in refineries and petrochemical plants around the world, and is an excellent example of our design capabilities delivering commercial benefits often in remote and demanding locations.

Zenith Wins Brick Chimney Demolition Project

Zenith Structural Assess Solutions Limited has won a contract to demolish a 70m High Brick Chimney at an hospital in Yorkshire, England. Zenith intends to carry out the work in early 2011. James Simpson, (Nebosh. AIIRSM. Tech IOSH.) Health & Safety Director comments, "The demolition of industrial chimneys is an extremely specialised field requiring a systematic and controlled approach. The ...

Zenith SAS - Structural Engineering Design Dept

Zenith SAS's specialist structural engineering division, provides clients with advice and recommendations to ensure that key project criteria - safety, serviceability, cost and client satisfaction - are achieved at all times. This front-end expertise is instrumental in the development of the innovative solutions we propose for temporary works design and for the strategies that are ...